CAS No.: | 7085-85-0 | Other Names: | Silicone Sealant |
---|---|---|---|
MF: | Mixture | EINECS No.: | 230-391-5 |
Classification: | Double Components Adhesives | Main Raw Material: | Epoxy |
Usage: | Construction | Type: | Structural Adhesive |
Modified Epoxy Resin: | Safe And Non-toxic | Material: | Modified Epoxy Resin |
Certificate: | Test Report Etc | Packing: | Barrel |
Shelf Life: | 18 Months | Color: | Dark Green |
MOQ: | 100kg | Product Name: | Steel Bonding |
Function: | Bonding+Sealing | Keywords: | Epoxy Resin |
Port: | Shanghai |
NJMKT Steel Bonding Adhesive (Dry process) (MKT-GSS/P)
Main Components: Modified epoxy resin, nanomaterials, other additives
Component A: Component B = 2:1
Features:
*Excellent thixotropy, non-drip for horizontal, vertical and overhead applications
*Very good resistance to age, chemical corrosion and water
*After cure time low shrinkage, wide range of mixing proportion, reasonable operable time
*Three types of cure condition: normal temperature, low temperature, wet environment
*Excellent properties of bonding strength, toughness, peeling strength and impact resistance
*Fast and easy stirring ensures accurate mixing proportion, when properly mixed, adhesive will be an even color for use
*Dry process: Mixed adhesive should be used up within 20~60 minutes (depending on specific ambient temperature), the density is about 1.60~1.65 g/cm3 (cured ), gel time is about 2~6 hours
*Wet process: Mixed adhesive should be used up within 20~50 minutes (depending on specific ambient temperature), the density is about 1.15~1.20 g/cm3 (cured), gel time is about 2~6 hours
Applications:
*Concrete structure, masonry structure reinforced with external steel encased, grouting for welded steel plate
*Bond the steel on the surface of beam, column to improve load capacity
*Steel liner plate of bridge supporting beam and foundation bed fixings
*Base and support fixtures for machinery and equipment
*Excellent adhesive strength on granite and tile for curtain wall installation
*Bonding, sealing, coating, protection, reinforcement for electronic components, instrument parts
*Repair and bond various materials of metal, ceramic, wood, and some plastic and glass
Standard: GB50367-2013, GB50728-2011
Installation:
1. Surface of concrete and steel plate must be clean, and polish treatment if rough surface
2. Mix adhesive according to mixing proportion
3. Bond the steel plate
4. Press to fix the steel plate
5. Cure treatment
6. Protective treatment
7. Sealing check
Caution:
*Mix the adhesive well according to its weight proportion strictly
*Construction crew should take steps of protective measures to keep it from eyes
*Remaining adhesive cannot be poured into original barrels
![]() |
![]() |
![]() |
Packing and Storage:
*Packing: Dry process: two kinds of package, 45kg (A+B two barrels)/pair; 10kg (A+B two barrels)/pair.
Wet process: two kinds of package, 30kg (A+B two barrels)/pair; 15kg (A+B two barrels)/pair.
*Shelf life: At least 12 months from date of manufacture in unopened container when store in dry and well-ventilated place. Please store in ambient temperature from 5 ℃ to 40 ℃, away from open flame, heating devices
*Handle with care, protect from rain, sunlight and place upward during loading and unloading transportation
1. Where is your factory located? How can I visit there?
Factory Address: No.3 Jinhua Road, Guli Industrial Park, Jiangning, Nanjing City, Jiangsu Province, China
Office Address: Room306-307, West District of WandaJinjie, No. 291 Shuiximen Road, Nanjing City, Jiangsu Province, China
Tel: +86 (0)25-86651110 / 4008-945-118
Mobile: 13813833494/13813882444
Warmly welcome domestic and international customers to visit us!
2. Are you a manufacturer?
Yes, we are. We have our own factory to manufacture customized products according to customers' need. We are specialized in developing and manufacturing constructions reinforcement materials for more than ten years.
3. Is your sample free?
Yes, our sample is free but the shipping charge will be on your side.
4. How to get the quotation?
We have a full range of products with different sizes and specifications. Please offer us project information with details, material and size requirements of products or send us design drawing for our team to make complete solutions, then we could supply a most reasonable and favorable quotation for you.
5: What is your payment terms?
We prefer 100% T/T. For other payment terms we could discuss for every case.
6: How long is the lead time (producing time) ?It depends on your order quantity and our factory production schedule. Usually we have a large stock of standard size products, and we can arrange and deliver the goods asap.